Well Master Plan Environmental Documents

Post

Outdoor view of building at Chain of Lakes Well

Environmental Documents

Zone 7’s Well Master Plan summarizes results of our work on several previous well design and implementation plans and provides a flexible road map intended to guide construction of new wells in our groundwater basin.

The plan identifies preferred locations for wells and wellfields, develops preliminary well construction details, assesses probable production rates of individual wells, assesses well spacing requirements, evaluates sustainable total well yields during drought, assesses potential water quality impacts of new wellfields, develops preliminary well facility designs, and prepares preliminary cost estimates. Our Well Master Plan is a critical component of our overall long-term water reliability strategy.

Final EIR Response to Comments (2005)

Draft EIR (2004)